Development, production and drilling
Maten Petroleum JSC
- Well control program for wells with inter-column pressures at Kara-Arna m/r
- GTP for construction of production wells 550 meters deep at Kara-Arna m/r
- GTP for construction of production wells with a depth of 650 meters at Matin m/r
- “Addendum No. 2 to the technological scheme of development of Kokarna East with Pre-EIA”
- “Addendum No.2 to the revised development project of Kara-Arna deposit with Pre-EIA”.
- “Addendum №3 to the revised development project of Matin field with Pre-EIA”
- “Assessment of oil reserves and resources of Matin, Kara-Arna and Kokarna East fields, Atyrau region, Republic of Kazakhstan using PRMS classification”.
- Author’s supervision over implementation of Addendum No.2 to the revised development project of Kara-Arna field.
- Author’s supervision over realization of addendum #2 to the technological scheme of Kokarna Vostochnaya m/r
- Author’s supervision over the implementation of Addendum No. 3 to the revised development project of Matin m/r
Kokmai LLP
- Development of a project for prospecting for oil and gas in subsalt sediments in the Kokmai area
Tabynai LLP
- Development of the Trial Production Project for the U-III deposit of the central section of the Tabynai field
- Author’s supervision over the implementation of the Trial
- Production Project for the Cretaceous deposits M-I, M-II of the southern and Jurassic deposit J-III of the northern section of the Tabynay field and its approval by all authorities.
- Northern basin of J-III horizon and Southern basin of M-1 horizon of oil fields of pilot production at Tabynai m/r.
- Working project of pilot production of the Southern basin of Cretaceous deposits M-I., M-II and Jurassic deposits J-III of the Northern and Central basin at Tabynai m/r.
- Technological scheme for the development of the Tabynay deposit
- GTP for the construction of production wells at the Tabynay field. 2000 m at the Tabynay field.
- GTP for construction of production wells at the Tabynai m/r. 1750 m at the Tabynai subdivision.
- Addendum to the group technical project for construction of production wells #60, 61, 62, 65, 66, 66, 67, 69, 70, 71, 72, 72, 73, 74, 75, 76, 77, 78 with depth of 1750 m at Tabynai m/r”.
- Analysis of the development of the Tabynay m/r
Ken-Sary LLP
- Group technical project for construction of exploration wells at Arystanovskoye field.
- Author’s supervision over the implementation of the
- Arystanovskoye field trial operation project.
Individual technical project for construction of directional exploration well at Arystanovskoye field. - GTP for construction of an exploration well at Arystanovskoye field.
- Trial Production Project at Arystanovskoye field
GTP for construction of exploratory wells #62-66 at Arystanovskoye m/r with a design depth of 3100 m with an EIA section - GTP for construction of directional well No. 61 at Arystanovskoye with a design depth of 3,100 meters with section EIA
- GTP for construction of advanced production wells #108-114 at Arystanovskoye m/r with a design depth of 3100 m with an EIA section
- Technological scheme of development of Arystanovskoye field as of 01.08.2011.
- Addendum to the Arystanovskoye Field Trial Production Project
- Author’s supervision over implementation of the technological scheme of development of Arystanovskoye field.
Karazhanbasmunai JSC
- Development of individual technical projects for construction of horizontal wells in Karazhanbas field
KazMunayGas EP JSC
- Rovnoye field development project.
- Refined development project for the Altykul field.
- Technological scheme for the development of the Y.V. Novobogat field.
KumkolTransService LLP
- Protection in the Interdepartmental Working Group for consideration of appeals and monitoring of subsoil users’ implementation of Gas Utilization Programs “Program for development of associated gas processing at Sarybulak field”.
- Development of the report “Author’s supervision over the implementation of the technological scheme of Sarybulak field development as of 01.11.2015.
- Geological and technical support of Sarybulak field production process
- Rendering technical services on conversion to continuous-discrete gas elevator with provision of necessary equipment for 2 wells of Sarybulak m/r Sarybulak.
- Rendering services on equipment installation support and “Pilot field works on testing of well heating unit UPS-150-00-80-MKM for ARPD prevention”.
- Recalculation of oil, gas and associated components reserves at Sarybulak field as of 01.09.2016.
Kazakhturkmunai LLP Aktobe Production Directorate
- Development of an addendum to the Program on associated gas utilization at the m/r of Kazakhturkmunai LLP
KazAzot LLP Shagyrly-Shomyshty PF
Shagyrly-Shomyshty M/I Industrial Development Project
Addendum to the Shagyrly-Shomyshty Industrial Development Project
Project of liquidation and conservation of facilities at Shagyrly-Shomyshty m/y.
SE for construction of exploration wells R-1, R-2, R-3, R-4 of Shagyrly-Shomyshty m/r.
Preliminary Environmental Impact Assessment (Pre-EIA) for
“Addendum to the Shagyrly-Shomyshty Industrial Development Project”.
Author’s supervision over the implementation of the Project of industrial development of the Shagyrly-Shomyshty gas field as of 01.07.2015.
Project of prospecting works on the Contract Territory of KazAzot LLP with Pre-EIA to it GTP for construction of 18 prospecting wells with depth of 4000 m at Kosbulak area.
Geological and technical support of gas production process at Shagyrly-Shomyshty area
Calculation of technical gas losses during gas production, treatment and transportation through the Shagyrly-Shomyshty gas trunkline SAC-2.5
Ansagan Petroleum JSC
- Determination and rationing of technological losses in the process of oil production, treatment and transportation for the North-West Zhetybai field for the period of 2015-2019.
- Analysis of development of the North-West Zhetybai field
- Program of development of associated gas processing of North-West Zhetybai field
- Author’s supervision over implementation of the development analysis of the North-West Zhetybai field”
Zhalgiztobemunai DTEO
- Determination and rationing of technological losses in the process of oil production, treatment and transportation for the North-West Zhetybai field for the period of 2015-2019.
- Analysis of development of the North-West Zhetybai field
- Program of development of associated gas processing of North-West Zhetybai field
- Author’s supervision over implementation of the development analysis of the North-West Zhetybai field”
Amangeldy Gas LLP
- Mining allotment project for the Ayrakty deposit
Airakty Pilot Production Project - Author’s supervision over the construction of production well No. 127 at Amangeldy field
- Development of norms of technological losses during production and primary treatment of gas and gas condensate at Amangeldy field.
- Development of GTP for construction of appraisal wells with a depth of 3700 m. Anabai m/r.
- Development of a technical project for construction of a production well at Zharkum m/r Zharkum
- Development of technical project for construction of appraisal well in Airakty m/r.
- Determination and calculation of the liquidation part of well No. 121 in Amangeldy m/r Amangeldy.
- Author’s supervision over the construction of production well #128 in Amangeldy m/r
- Adjustment of the mining allotment project for the development of the Amangeldy gas condensate field, obtaining a mining allotment from the RCGI and the MID Geology Committee.
- Development of a revised project for commercial development of the Amangeldy gas condensate field
GTP for construction of production wells #131, 132, 133, 134 at Amangeldy m/r. - Author’s supervision over construction of production well No. 129 at /r Amangeldy.
ITP for construction of directional wellbore of production well No. 7 at Zharkum m/r Zharkum - Author’s supervision over construction of production well No. 131 at Amangeldy m/r Amangeldy.
ITP for construction of directional borehole in well No. 125 in Amangeldy m/r Amangeldy.
Amangeldy Gas LLP
- Mining allotment project for the Ayrakty deposit
Airakty Pilot Production Project - Author’s supervision over the construction of production well No. 127 at Amangeldy field
- Development of norms of technological losses during production and primary treatment of gas and gas condensate at Amangeldy field.
- Development of GTP for construction of appraisal wells with a depth of 3700 m. Anabai m/r.
- Development of a technical project for construction of a production well at Zharkum m/r Zharkum
- Development of technical project for construction of appraisal well in Airakty m/r.
- Determination and calculation of the liquidation part of well No. 121 in Amangeldy m/r Amangeldy.
- Author’s supervision over the construction of production well #128 in Amangeldy m/r
- Adjustment of the mining allotment project for the development of the Amangeldy gas condensate field, obtaining a mining allotment from the RCGI and the MID Geology Committee.
- Development of a revised project for commercial development of the Amangeldy gas condensate field
GTP for construction of production wells #131, 132, 133, 134 at Amangeldy m/r. - Author’s supervision over construction of production well No. 129 at /r Amangeldy.
- ITP for construction of directional wellbore of production well No. 7 at Zharkum m/r Zharkum
Author’s supervision over construction of production well No. 131 at Amangeldy m/r Amangeldy. - ITP for construction of directional borehole in well No. 125 in Amangeldy m/r Amangeldy.
ТОО «Терминал подготовки нефти»
- Determination and rationing of technological losses during acceptance, preparation, transportation, storage and delivery of oil of the terminal of “Oil Parent Terminal” LLP
Kor-Tazh Munai LLP
- Typical project of liquidation and conservation of wells in Ravninnoye field
- GTP for construction of exploratory wells Nos. 25, 26, 27 at Ravninnoye m/r, depth 4500 m.
Munai Service LTD LLP
- GTP for construction of wells Nos. 127,128,129 in Amangeldy m/r.
Trans Oil Terminal LLP
- Determination of technological losses during oil storage, preparation and shipment by NNT and PSP Zhamansor of TransOilTerminal LLP for 2016-2020.
JSC SNPS-Aktobemunaigas
- Technical services for conversion to continuous-discrete gas lift with provision of necessary equipment for wells in the Severnaya Truva area
JSC Crystal Management
- Group technical project for construction of prospecting and exploration wells KM-2, KM-2_1, KM-2_2 with depth of 2000 m – Group technical project for construction of prospecting and exploration wells KM-1, KM-1_1, KM-1_2 with depth of 2600 m
KoZhan S.A.
- Assessment of oil reserves in Morskoye (including Ogayskoye), Karatal, Dauletaly areas
Энергетический холдинг Affluence
- Independent appraisal of prospective hydrocarbon resources at 5 licence blocks of Affluence Energy Holding Company
Energoholding-A LLP
- GTP for drilling of 26 production injection wells at the Bozoi UGSF. GTP for drilling of 10 production production production wells at the Bozoi UGSF. RP Development of 36 gas production wells at Bozoi UGSF.
MEERBUSH LLP
- Author’s supervision over the implementation of design solutions of the Technological Scheme for Kulzhan field development
Firm ALMEX PLUS LLP
- Addendum No.2 to the Project of pesticide works of the contractual territory of ALMEX PLUS LLP and Pre-EIA