Geology, exploration, reserve estimates
Mangistaumunaigas JSC
- Report “Geological structure, oil and gas bearing capacity of Karagiyskaya saddle and Segendyk depression in the light of new data, prospects for resumption of exploration works”
- Report “Geological structure, oil and gas bearing capacity and prospects for discovery of hydrocarbon deposits in Mesozoic sediments of the western part of the Zhetybai-Uzen tectonic stage”.
ArnaOil LLP
“EIA on development of the East Kok-Arna field”.
Recalculation of oil and gas reserves according to the state of study as of 01.12.2010 of the East Kok-Arna field.Scientific and research support of pilot tests of gel polymer systems (GPS) at the pilot site of Kara-Arna field.
Report on the results of analysis of 3D seismic interpretation at Kokarna Vostochnaya field.Construction of overhead line-10, installation of switchgear-10 at Kara-Arna East field.
Scientific and technical support of testing of thermal methods of oil production stimulation at Kara-Arna field.
Analysis of 3D seismic interpretation at Vostochnaya Kakarna field and issuance of recommendations.
Design of 3D seismic surveys, comparative analysis and economic evaluation of options at Kara-Arna field.
Creation of a database on production well stock, geophysical and hydrodynamic studies for Kara-Arna field.
Creation of a database on operational well stock, geophysical and hydrodynamic studies for Vostochnaya Kokarna m/r.
Development of recommendations on technique and technology of oil production based on the analysis of well stock operation in Kara-Arna m/r.
Development of recommendations on technique and technology of oil production on the basis of analysis of well stock operation at Vostochnaya Kokarna m/r.
Recommendations on prevention of sand deposition during operation of wells with depth pumps in Kara-Arna m/r.
Comprehensive analysis of open and closed borehole logging (OBS) materials in order to determine the current saturation pattern in Kara-Arna and Kara-Arna m/r.
Ken Sary LLP
- Operational calculation of hydrocarbon reserves of the Arystanovskoye field.
- Addendum to the Arystanovskoye field exploration project
GTP for construction of advanced production wells ##108-114 at - Arystanovskoye field with a design depth of 3100 meters with the section of environmental protection.
- Arystanovskoye Field Trial Production Project.
Atash Company LLP
- Report on the results of geological exploration in the Contract area in the Kazakhstan sector of the Caspian Sea RK.
Tandai Petroleum LLP
- Re-interpretation of 3D materials for the Zholdybay area taking into account data from new wells in order to clarify the structure of existing deposits and make new promising targets
OrdabasyMunaiGas JSC
- Preparation of the report “Feasibility Study on the Returned Territory of the Subsalt Exploration Block of Tengizchevroil LLP”.
Petroleum Geo Services (Kazakhstan) LLP (PGS)
- Acoustic inversion using 3D seismic cube to assess prospects of oil and gas bearing capacity of the basement in Akshabulak, Nuraly and Aksai meters
Meerbusch LLP
- Addendum No. 2 to the Kulzhan field exploration project
- Addendum to the GTP for construction of advanced production wells #100-102 at the Kulzhan field with the Environmental Protection Section.
Dala Geo LLP
- Development of “Group technical project for construction of 6 vertical exploration wells №№ 16,17,18,19,20,21 with a depth of 2,600 meters” with the section of environmental protection in the North Karamandybas m/r.
JV Matin LLP
- Operational calculation of oil and gas reserves of Permo-Triassic deposit of Matin field as of 01.01.2010.
- Increase of oil and gas reserves in act I and act II deposits of the southern wing of the Matin field as of 01.01.2010.
- Project of trial exploitation of Triassic deposit of Matin field.
- Addendum to the revised project of Matin field development
- Analysis of the RPM system of the Matin field and recommendations on improvement of the applied technology.
- Analyzing the results of exploratory well drilling at the Matin field
- Updating the geological model and adapting the hydrodynamic model taking into account the drilling data from the wells drilled in the Matin field.
- Analysis of the existing system of reservoir pressure maintenance at Matin field and recommendations on improvement of the applied technology.
- Drawing up a revised development project for the Matin field
- Report: “Increase of oil and gas reserves in Apt I and Apt II deposits of the southern wing of Matin field according to the state of study as of 01.01.2010”.
- Report: “Operational calculation of oil and dissolved gas reserves of Permo-Triassic deposit of Matin field as of 01.01.2010”.
Analysis of drilling results of exploratory wells at Matin m/r. - Comprehensive analysis of geophysical and field data to determine current fluid contacts.
- Creation of a database of drilled wells: GTM, GIS and GDIS
Recalculation of oil and gas reserves of Matin m/r of Atyrau region of the Republic of Kazakhstan according to the state of study as of 01.01.2012.