Geology, exploration, reserve estimates
Emir-Oil LLP
Project of prospecting works in the Borly and Esen areas.
Project of prospecting works in the North Kariman area.
Operational calculation of hydrocarbon reserves of the Aksaz field.
Operational calculation of hydrocarbon reserves of the Kariman field.
Addendum to the individual technical project for construction of prospecting well No. 1 in the Yesen area due to changes in well design (reserve variant, liner).
Addendum to the group technical project for construction of exploratory wells #1, 2 in the North Kariman area due to changes in well design (reserve variant, liner).
Tabynai LLP
- Operational calculation of hydrocarbon reserves of the Tabanai field.
- Final calculation of hydrocarbon reserves of the Tabanai field.
- Report on the results of geological exploration works in the
- Contract area within block XXIX-16-C (partially), F (partially) in
- Mangistau region (in connection with the return of part of the Contract area), performed by “Tabynay” LLP in 2000-2009 under the contract № 590 from 12.12.2000.
- Development of GTP for the construction of vertical operational wells No. 6062. Wells №№6062, 65-67, 69-78 with depth of 1750 meters. At the Tabynay field.
- Development of the Technological Scheme for development of the Tabynay field
- Operational calculation of oil, gas and condensate reserves in the M-11 Cretaceous deposit of the Northern and Jurassic deposits of the North-Western sections of the Tabynay field.
- Execution of the Report on the Operational Estimation of Oil, Gas and Condensate Reserves for the M-II, U-IV deposits of the Northern, U-III, U-IV of the Central and U-V, U-VI of the North-Western sections of the Tabynai area and its approval by all the authorities
- Finalization of the final oil, gas and condensate reserves estimate for the Tabynay field and the Feasibility Study of the KIN.
- Digitization of GIS curves for wells #3, 8, 50 in the southern section of Tabynay m/r.
- Addendum to the group technical project for construction of production wells #60, 61, 62, 65, 66, 67, 69, 69, 70, 71, 71, 72, 73, 74, 74, 75, 76, 77, 78 with a depth of 1750m at Tabynai m/r” in connection with the use of an additional ZJ-30 drilling pack
- “Recalculation of oil, gas and condensate reserves of the Tabynay field, Mangistau region of the Republic of Kazakhstan” (as of 01.06.2016).
KazMunayGas EP JSC
- Estimation of oil and gas reserves of the UAZ field;
- Project. Study of the nature of articulation of the North-Bozashi uplift in the area of Star, Ostravnaya, Karaturun, Kalamkas, Araldy structures;
- Drawing up a project for unloading wells in the area of Aksai river (geological);
- Conducting seismic stratigraphic analysis of 2D, 3D-MOGT and VSP data and identification of exploration drilling targets in the Uzen and Karamandybas fields;
- Study and analysis of the internal structure and assessment of oil and gas prospects of the Triassic complex of the Makat Vostochny area.
- Report. Analysis of geological and geophysical materials in the areas of Zhazgurlinskaya depression and Big Mangyshlak flexure in order to select objects for prospecting.
NC KazMunayGas JSC
- Study of the geological structure and assessment of oil and gas bearing prospects of Jurassic and Triassic sediments of the Karynzharyk saddle in order to select priority objects of prospecting and exploration works.
JV KazGerMunai LLP
- Project of liquidation of consequences of activities at Akshabulak and Nuraly fields”.
- Technical project for construction of an appraisal directional well with a design depth of 2100 meters at the Nuraly field.
- Development of formulation for water influx isolation works.
- Development of the report “Project of liquidation of consequences of activity of ‘JV ’Kazgermunai” LLP on Akshabulak m/r”.
- Development of the report “Project of liquidation of consequences of activity of ‘JV ’Kazgermunai” LLP on Nuraly m/r”.
- Comprehensive geological and technical study on carrying out of work on PPD, injection of formation and artesian water in Akshabulak and Nuraly meters.
- Assessment of oil and gas bearing capacity of foundation prospects.
- Development of ITP for construction of directional wells Nos. 42, 43, 78, 85 in Nuraly m/r.
- Development of ITP for construction of directional wells №41 of Nuraly m/r Nuraly.
- Preparation of recommendations on separate injection of fresh and produced water
- Assessment of oil and gas bearing capacity of foundation prospects
Sheld RD Offshore Ventures Limited, Kazakhstan
- Project of geological exploration works on the Zhemchuzhiny block.
MK Exploration Corporation
- Report “On the Results of Geological and Geophysical Surveys of the Mertvyi Kultuk Block in Connection with the Return of the Contract Territory”
Филиал компании «Тюб Караган Оперейтинг ЛТД»
- Project for research and development (R&D) on basin modeling.
- Refinement of the structural-tectonic model of the Tyub-Karagan contract area on the basis of paleotectonic reconstruction.
Karakudukmunai LLP
- Assessment of oil and gas prospects of the Triassic complex of Northern Ustyurt and Karakuduk area
SNPS Ai Dan Munai JSC
Operational calculation of oil and dissolved gas reserves at Sarybulak structure as of 01.02.2008.
Development of the Trial Production Project for the Sarybulak field
Development of Associated Gas Utilization Program for the period of trial operation at Sarybulak field.
Development and defense of the Author’s supervision over realization of the Trial Operation Project of Severnoye Priozernoye field as of 01.03.2009.
Development of the development project of Sarybulak m/r for the period of industrial development, as well as coordination in state authorities and state expertise.
Additional works to the development of the project of Sarybulak m/r Sarybulak for the period of industrial development
Development of the Report “Operational calculation of oil and dissolved gas reserves in Sarybulak m/r.
Author’s supervision over the implementation of the Trial Production Project of Sarybulak field.
Addendum to the Sarybulak Trial Production Project