JSC Karazhanbasmunai

  • Re-equipment of treatment facilities “Biological water treatment station with a capacity of 700 m3/day at Karazhanbas field”. –

  • Project “Construction of a new oil and gas gathering and transportation system at the territory of workshop 1VVG”. –

  • Project “Collection system of in-field oil and gas transport of Karazhanbas field 7-10 stage”. – Project “Construction of steam generating station BCP-3 in the eastern part of Karazhanbas m/r”. – Project “Construction of GZU-34 of Karazhanbas field. Stage 2”. – Shift camp of Karazhanbas m/r. Construction of VGS-700 m3 for Volga water intake. – Construction project of in-field oil and gas wires with total length of 500 km at Karazhanbas field.

  • Construction of commercial oil metering centre. Karazhanbas fields. – Construction of external power supply of the system of collection and utilisation of oil associated gas GZU-27,30,31,32,33 of Karazhanbas field.

  • Oil and gas gathering and in-field transport system, including a system for 27 wells for steam injection at Karazhanbas field. – Construction of a new oil Main (II) collector from GZU-5 PTV to CPPN and a new oil collector from GZU-34 to the Main (II) collector of Karazhanbas field.

  • Author’s supervision of the construction process of the object “Oil gathering and in-field transport system, including the system of 27 wells arrangement for steam injection of Karazhanbas field 13 stage. 130 wells 1st stage”.

  • Author’s supervision for construction of a new oil gathering and transport system at the territory of workshop 1 of BBG of Karazhanbas m/r 2 stage of 50 wells. – Author’s supervision of construction of BCP-4 at Karazhanbas field. Construction of steam distribution networks to 72 wells in the eastern part of Karazhanbas field”. – Author’s supervision over the construction of “Installation of multiphase pumps at the section of BBG -1, Karazhanbas field”. – Development of standard design and estimate working documentation on “Multiphase pumps installation on Karazhanbas field” – Reconsideration of the project of construction of GZU-16 of Karazhanbas field with competent state organisations, carrying out of the State Expertise and changes in the approved part of the project – Additional engineering and geodetic surveys on the project “Collection system and in-field transport for 31 wells”. – Typical project “Development of oil producing wells in Karazhanbas m/r” – Construction of water supply collector to the existing injection wells. Karazhanbas field.”.

  • Construction of GZU-16 of Karazhanbas field. Correction. – Construction of GZU-12 of Karazhanbas field. – Construction of oil production well at Karazhanbas field. – Construction of water injection well at Karazhanbas m/r – Installation of multiphase pumps at Karazhanbas m/r – Construction of steam injection well at Karazhanbas m/r – Oil gathering and in-field transport system for 29 oil producing wells at Karazhanbas m/r. – General project of Karazhanbas m/r according to the specified development project as of 01.07.08 and coordination of the project with state authorities. – Development of the Programme “Justification of design of field pipelines without installation of the system of electrochemical protection of pipelines”.

  • Разработка типового проекта «Обустройство паронагнетательных скважин на м/р Каражанбас»
  • Development of standard project “Development of water injection wells at Karazhanbas m/r” – Justification of design of field pipelines without electrochemical protection system for pipelines – Development of industrial safety declaration for projected facilities as part of the general project of Karazhanbas m/r development according to the revised project of Karazhanbas m/r development as of 01.07.2008 – Execution of repeated expertise of working project “Construction of commercial oil metering station”.

     

SNPS - Ai-Dan Munai JSC

  • Development of the Arysskoye field”; – Development of the Sarybulak field for the period of commercial development. – Development of the Sarybulak field.

ТОО "СП "КазГерМунай"

  • – Project on Elimination of Consequences of Activities in Akshabulak and Nuraly Municipalities”

ТОО "Каракудукмунай"

  • Construction of a commercial oil metering station at the Karakuduk field.

ТОО "Тасбулат Ойл Корпорейшен"

  • – M/R Turkmenenoi. Project of two-transformer substation PS-35/6 kV and 35 kV overhead line. – Development of the Aktas field. – Oil gathering and in-field transport system at Turkmenenoi field. – Author’s supervision of the construction process for the project “Development of the Aktas field. Volume 4, overhead power supply line VL-6Kv”.

Buzachi Operating LTD.

  • Development of northern Buzachi m/r under industrial development. Phase 4. Stage 2. – Project for installation of 10000 m3 tanks for commercial oil at the North Buzachi field. 
  • Development of the North Buzachi field under commercial development. Central Oil Transfer Point (COTPP). Tank farm of marketable oil 4×10000 m3.

Atre LLP

  • Project for the construction of a motorway in the Atre area

Kamenistoe LLP

  • Project. Access road and site for construction of well No.5 at Kamenistoe field. – EIA for the project “Kamenistoe Field Development for the Trial Production Period”. 
  • Development of the Kamenistoe oil field for the trial production period.

Arystan-1 LLP

  • Working project “Construction of steam generating station BCP-3 in the eastern part of Karazhanbas field – II stage”

Ken-Sary LLP

  • Pre-EIA to the project “Trial Production of Arystanovskoye Field” – PSD “Addendum to the working project “Oil pipeline from Arystanovskoye oil treatment facility to the point of tie-in to the main oil pipeline of KTO JSC with commercial oil metering station and tank farm”. – Drawing up and translation of PSD “Gas-generator station of Arystanovskoye m/r”.

  • Adjustment of the working project “Gas generator station of Arystanovskoye m/r Arystanovskoye” in connection with the change of the size of the site of the operator’s room – Author’s supervision over the construction of the object “Sites and access road of the gas piston power plant of Arystanovskoye m/r Arystanovskoye”.

  • Author’s supervision over the construction of the project “Gas piston power plant in Arystanovskoye m/r”.

Tolkynneftegaz LLP

  • Draft standards for maximum permissible emissions from oil operations at the Tolkyn field

NC KazMunayGas JSC

  • Pre-EIA of oil operations at the Urikhtau project.

KazEmir Oil Development Almaty LLP

  • Development of the Burbaital-Karatobe m/r for the trial operation period

JV Arman LLP

  • Construction of two formation water heating furnaces at Arman m/r. Installation of a 2GM4 compressor.