Field development, EIAs

Tandai Petroleum LLP

  • Construction of Zholdybay-Zhamansor motorway;
  • Construction of motorway from Kotyrtas PS to Zhylankabak field. – Shift camp of Zholdybai and Zhylankabak fields.

ТОО "СП "Аксай"

  • Intra-field roads and production well sites at the East Kokarna field.
  • Linking the designed vertical production wells to the “Group Technical Project for construction of vertical wells at the Tabynay field”.

Embamunaigas PF

  • EIA during isolation and abandonment works at wells.

KASKO Petrostar LLP

  • EIA during isolation and abandonment works at wells.

JV Matin LLP

  • Construction of oil pipeline Zhamansor-pipeline “Kenkiyak-Atyrau” 15 km long. – Construction of 15 km length of the Zhamansor-Kenkiyak-Atyrau gas pipeline. – Reserve park for oil reception and storage with fire extinguishing system. – Pumping station for oil supply to the main pipeline. – Construction of 0,4 kV power grids and KTPN-630/10/0,4, chemical laboratory operator’s room, power station, checkpoint with territory improvement. – Commercial oil metering station (KUUN). – Working project: “Tank farm of commercial oil with fire extinguishing system”. – Working project: “Pumping station of oil supply to the main oil pipeline (with oil heating system)”. -Working project: “Construction of internal electrical network, KTPN – 630-10/0,4 operator’s room, checkpoint”. – Working project: “Oil pipeline Zhamansor – Kenkiyak-Atyrau pipeline with length of 17 km”. – Working project: “Gas pipeline Zhamansor – pipeline Kenkiyak – Atyrau with length of 17 km”. – Working project: “10kV overhead line from PS-35/10 “Zhamansor” to Kenkiyak-Atyrau pipeline with length of 4 km”. – Working project: “Engineering-geodetic surveys”. – Project of development of newly drilled production wells on Matin m/r – Working project: “Commercial oil metering station” – Creation of project documentation on Construction of hostel type dormitory in the area of PSP Zhamansor – Project “Construction of dormitory for 30 places on Matin m/r”. – Project “Construction of a box for 10 cars in Matin m/r”. – Development of the working project “Expansion of the collection system in Matin m/d – 7 wells”.
    *** Translated with www.DeepL.com/Translator (free version) ***

     

JSC Caspian Oil

  • Addendum No.2 to the Ayrankol m/r development project “Ayrankol m/r gas piston power plant construction project – Addendum to the Ayrankol m/r development project

Maten Petroleum JSC

  • “Development and co-ordination with all necessary authorities of draft standards for MPE, MPD, EIA of waste management project and plans of approved measures of PMP, IEC of obtaining emission permits”.

  • Development of Industrial Safety Declaration – Expansion project “RAP system at Kokarna East m/r” – Expansion project “RAP system at Kara-Arna m/r” – PSD “Construction of RWS 2000 m.2 at Kara-Arna m/r”

  • PSD “Construction of RWS 2000 m.2 at Kara-Arna m/r” – PSD “Construction of RWS 1000 m.2 at Matin m/r”.

     

AF "OrdabasyMunayGas" JSC

  • “Development of the Project on expansion of “Reception of 2-stage system of preparation, storage and delivery of oil at the Terminal of
  • Preparation (TP) Zhamansor and PSN on 266th km of Kenkiyak-Atyrau main oil pipeline”
  • “Drawing up of Industrial Safety Declaration” – Development of Industrial Safety Declaration

ТОО "Казахтуркмунай"

  • “Author’s supervision over the construction of a reservoir pressure maintenance system at Karatobe Yuzhnoye field

JSC KMC Munai

  • “Design and survey works on the object: “Expansion of the oil gathering and transport system of the Kokzhide Nadsolevoye field”.

Arnaoil LLP

  • Restoration of project documentation of Kak Arna m/r – Construction of overhead line-10, installation of switchgear-10 in Kara Arna m/r, East Kokarna
  • Development of wells of Kara Arna field – Pre-application to the Project of prospecting works on suprasalt deposits of Kara Arna m/r due to expansion of the Contract area

MEERBUSCH LTD.

  • Restoration of project documentation of Kak Arna m/r – Construction of overhead line-10, installation of switchgear-10 in Kara Arna m/r, East Kokarna
  • Development of wells of Kara Arna field – Pre-application to the Project of prospecting works on suprasalt deposits of Kara Arna m/r due to expansion of the Contract area

Maersk Oil Kazakhstan GmbH

  • Dunga field development (CPS expansion) – Adjustment and approval of the project “Dunga field development. Stage 2 (CPS Expansion Adjustment)”.

  • Co-operation in prospecting and Development of hydrocarbon fields in Mangistau region – Dunga field – System design, supervision, etc., oil export, supervision of works at the stage of completion of the project “Expansion of Dunga field. Phase 1” –

  • Development of the approved part of the project, detailed design, executive documentation and author’s supervision of the Dunga m/r Development Project (Phase I)

  • Development of an addendum to the Dunga m/r Development Project. Stage 1 (expansion of the rezevoir park at the CPF and development of the DGC-1H carbonate well)

  • Installation of the 3rd export pump R-111S at the Dunga CPF.

     

Kokmai LLP

  • Pre-Application for the project of prospecting for oil and gas in subsalt sediments in the Kokmai area