Tandai Petroleum LLP
- Construction of Zholdybay-Zhamansor motorway;
- Construction of motorway from Kotyrtas PS to Zhylankabak field. – Shift camp of Zholdybai and Zhylankabak fields.
ТОО "СП "Аксай"
- Intra-field roads and production well sites at the East Kokarna field.
- Linking the designed vertical production wells to the “Group Technical Project for construction of vertical wells at the Tabynay field”.
Embamunaigas PF
- EIA during isolation and abandonment works at wells.
KASKO Petrostar LLP
- EIA during isolation and abandonment works at wells.
JV Matin LLP
Construction of oil pipeline Zhamansor-pipeline “Kenkiyak-Atyrau” 15 km long. – Construction of 15 km length of the Zhamansor-Kenkiyak-Atyrau gas pipeline. – Reserve park for oil reception and storage with fire extinguishing system. – Pumping station for oil supply to the main pipeline. – Construction of 0,4 kV power grids and KTPN-630/10/0,4, chemical laboratory operator’s room, power station, checkpoint with territory improvement. – Commercial oil metering station (KUUN). – Working project: “Tank farm of commercial oil with fire extinguishing system”. – Working project: “Pumping station of oil supply to the main oil pipeline (with oil heating system)”. -Working project: “Construction of internal electrical network, KTPN – 630-10/0,4 operator’s room, checkpoint”. – Working project: “Oil pipeline Zhamansor – Kenkiyak-Atyrau pipeline with length of 17 km”. – Working project: “Gas pipeline Zhamansor – pipeline Kenkiyak – Atyrau with length of 17 km”. – Working project: “10kV overhead line from PS-35/10 “Zhamansor” to Kenkiyak-Atyrau pipeline with length of 4 km”. – Working project: “Engineering-geodetic surveys”. – Project of development of newly drilled production wells on Matin m/r – Working project: “Commercial oil metering station” – Creation of project documentation on Construction of hostel type dormitory in the area of PSP Zhamansor – Project “Construction of dormitory for 30 places on Matin m/r”. – Project “Construction of a box for 10 cars in Matin m/r”. – Development of the working project “Expansion of the collection system in Matin m/d – 7 wells”.
*** Translated with www.DeepL.com/Translator (free version) ***
JSC Caspian Oil
- Addendum No.2 to the Ayrankol m/r development project “Ayrankol m/r gas piston power plant construction project – Addendum to the Ayrankol m/r development project
Maten Petroleum JSC
“Development and co-ordination with all necessary authorities of draft standards for MPE, MPD, EIA of waste management project and plans of approved measures of PMP, IEC of obtaining emission permits”.
Development of Industrial Safety Declaration – Expansion project “RAP system at Kokarna East m/r” – Expansion project “RAP system at Kara-Arna m/r” – PSD “Construction of RWS 2000 m.2 at Kara-Arna m/r”
PSD “Construction of RWS 2000 m.2 at Kara-Arna m/r” – PSD “Construction of RWS 1000 m.2 at Matin m/r”.
AF "OrdabasyMunayGas" JSC
- “Development of the Project on expansion of “Reception of 2-stage system of preparation, storage and delivery of oil at the Terminal of
- Preparation (TP) Zhamansor and PSN on 266th km of Kenkiyak-Atyrau main oil pipeline”
- “Drawing up of Industrial Safety Declaration” – Development of Industrial Safety Declaration
ТОО "Казахтуркмунай"
- “Author’s supervision over the construction of a reservoir pressure maintenance system at Karatobe Yuzhnoye field
JSC KMC Munai
- “Design and survey works on the object: “Expansion of the oil gathering and transport system of the Kokzhide Nadsolevoye field”.
Arnaoil LLP
- Restoration of project documentation of Kak Arna m/r – Construction of overhead line-10, installation of switchgear-10 in Kara Arna m/r, East Kokarna
- Development of wells of Kara Arna field – Pre-application to the Project of prospecting works on suprasalt deposits of Kara Arna m/r due to expansion of the Contract area
MEERBUSCH LTD.
- Restoration of project documentation of Kak Arna m/r – Construction of overhead line-10, installation of switchgear-10 in Kara Arna m/r, East Kokarna
- Development of wells of Kara Arna field – Pre-application to the Project of prospecting works on suprasalt deposits of Kara Arna m/r due to expansion of the Contract area
Maersk Oil Kazakhstan GmbH
Dunga field development (CPS expansion) – Adjustment and approval of the project “Dunga field development. Stage 2 (CPS Expansion Adjustment)”.
Co-operation in prospecting and Development of hydrocarbon fields in Mangistau region – Dunga field – System design, supervision, etc., oil export, supervision of works at the stage of completion of the project “Expansion of Dunga field. Phase 1” –
Development of the approved part of the project, detailed design, executive documentation and author’s supervision of the Dunga m/r Development Project (Phase I)
Development of an addendum to the Dunga m/r Development Project. Stage 1 (expansion of the rezevoir park at the CPF and development of the DGC-1H carbonate well)
Installation of the 3rd export pump R-111S at the Dunga CPF.
Kokmai LLP
- Pre-Application for the project of prospecting for oil and gas in subsalt sediments in the Kokmai area